3P Safety Inspections logo 3P Safety Inspections
NCCCO-Certified Inspections · All 50 States · 24–72 Hour Scheduling

What Happens During a Crane Inspection

A crane inspection is not a mystery, and it should not be a disruption. From the first call to the final report, the process follows a clear set of steps built around your schedule. Here is exactly what to expect when we come out — what we need before we arrive, what happens on site, and what lands in your inbox afterward.

153+
Cities Served
50
States Covered
24–72h
Scheduling
100%
NCCCO Certified
✓ NCCCO Inspector Certified ✓ OSHA & ASME B30 Compliant ✓ Photo-Documented Reports ✓ Independent Third-Party ✓ EM 385-1-1 · USACE · NAVFAC

We are 3P Safety Inspections, a third-party crane inspection company working all 50 states. Our team carries NCCCO certification. We inspect to OSHA and the ASME B30 codes, and we do not sell or rent cranes — so our reports just give you the facts.

Independent Third-PartyWe do not sell or rent cranes. Our report has no sales angle — just the facts.
NCCCO-Certified InspectorsEvery inspection is signed by a credentialed, qualified-person inspector.
24-72 Hour SchedulingQuotes in about a business day. We reach most sites in 24 to 72 hours.
Photo-Documented ReportsA clear PDF with each finding tied to a photo and the exact OSHA or ASME rule.
Inspecting cranes since 2005Independent — we do not sell or rent cranesNCCCO-certified inspectorsAll 50 states · 24–72 hr schedulingPhoto-documented reports
Free Printable Checklists (PDF)

Step 1 — Before We Arrive

A good inspection starts before anyone shows up. We line up the visit so it goes fast on site:

Step 2 — On-Site Check-In

When we arrive, we fit into your site, not the other way around:

Step 3 — The Inspection, Part by Part

The inspector works the machine methodically, against OSHA and ASME B30, photographing as they go — our guide to what a crane inspector actually looks for walks the full list system by system:

Step 4 — Operational Tests

Where it is safe and called for, we run the crane through its motions — hoist, swing, travel, and brake checks. We confirm the safety devices, limit switches, and operator aids do what they should. On a new crane, after a major repair, or where the standard requires it, this can include a rated-capacity load test.

Step 5 — Findings and Report

We close out with a clear result, on site and on paper:

If a finding does ground the crane, the road back is well marked — here is what happens if your crane fails inspection, step by step.

How Long Does It Take?

A single mobile-crane annual usually runs a few hours. A multi-crane yard or a tower crane takes longer, and a load test adds time. We plan around your work and can batch a whole fleet into one visit to keep the disruption — and the cost — down. Rush jobs are fine. Just ask.

What We Need From You

Very little. A list of the cranes, the site address, and access details is enough to start. Having the crane log and prior reports on hand speeds the visit, and a point of contact who knows the work schedule helps us stay out of your way. We handle the rest.

Crane Inspection Frequency at a Glance

InspectionHow OftenWho Performs ItWhat It CoversRecord Kept?
Pre-shift / DailyBefore each shift or useCompetent person (often the operator)Controls, brakes, wire rope, hooks, leaks, tires or tracks, safety devicesGood practice
MonthlyEvery 30 daysCompetent personWire rope along its length, hooks and latches, hoist brakesYes — signed and dated
FrequentDaily to monthly, by service classCompetent personRunning gear and high-wear items per ASME B30Per your program
Annual / PeriodicEvery 12 monthsQualified personThe full machine: structure, welds, sheaves, drums, hydraulics, controlsYes — full written report
After an eventAfter a repair, modification, storm, or idle periodQualified personThe affected systems, before the crane returns to serviceYes

The Standards Behind These Checks

Every report names the rule behind each find:

What You Get in Your Report

Here is what lands in your inbox:

Why Owners Pick 3P Safety Inspections

We inspect cranes and nothing else. We show up when we say and write reports a foreman can read. The quote is the price.

Frequently Asked Questions

What happens during a crane inspection?

We coordinate access and review the crane log, check in on site, then work the machine part by part — structure, rope, hooks, brakes, controls, hydraulics — run operational tests where safe, and close with a photo-documented report tied to the exact OSHA and ASME rules.

How long does a crane inspection take?

A single mobile-crane annual usually runs a few hours. A multi-crane yard or a tower crane takes longer, and a load test adds time. We plan around your work and can batch a whole fleet into one visit.

Will the crane be out of service during the inspection?

Only briefly, for the operational tests. We schedule around your lifts to keep downtime short, and rush jobs are fine.

What do I need to provide for a crane inspection?

A list of the cranes, the site address, and access or badging details to start. The crane log and prior reports on hand speed the visit, and a contact who knows the work schedule helps us stay out of your way.

Do you test the crane under load?

Where it is safe and called for — rated-capacity proof loads on new gear, after a major repair, or on the ASME cycle. Routine annuals are mostly functional and visual.

What do I get at the end of the inspection?

A clear PDF report with photos, severity ratings, each finding tied to the exact OSHA or ASME rule, and a prioritized punch list of what to fix first — usually within days.

What if the crane fails during the inspection?

We sort findings by severity. A critical item takes the crane out of service until fixed. We verify the repair and update the record so it returns to work with a clean file.

Do you inspect cranes in all 50 states?

Yes. We cover all 50 states with NCCCO-certified inspectors, quote most jobs in about a business day, and reach most sites in 24 to 72 hours.

Authoritative References

OSHA 1926.1412 — Construction Crane InspectionThe official standard, straight from the source.Visit source about OSHA 1926.1412 — Construction Crane Inspection
OSHA 1910.179 — Overhead & Gantry CranesThe official standard, straight from the source.Visit source about OSHA 1910.179 — Overhead & Gantry Cranes
ASME B30 — Safety Standard for Cranes & RiggingThe official standard, straight from the source.Visit source about ASME B30 — Safety Standard for Cranes & Rigging
NCCCO — Crane Operator & Inspector CertificationThe official standard, straight from the source.Visit source about NCCCO — Crane Operator & Inspector Certification

Ready to Schedule Your Inspection?

Tell us your equipment types, locations, and inspection window. NCCCO-certified inspectors mobilize nationwide in 24 to 72 hours, and every engagement closes with a photo-documented, standards-cited report.

3P Safety: 5.0 on Google27 reviewsRead them on Google →
Follow 3P Safety: Facebook | Instagram | X | YouTube
Call (252) 229-5238Get a Quote