3P Safety Inspections logo 3P Safety Inspections
NCCCO-Certified Inspections · All 50 States · 24–72 Hour Scheduling

Rigging & Sling Inspection Sheet

Slings and below-the-hook hardware carry the load under the hook, so they are inspected before each use by the rigger and on a documented periodic schedule under OSHA 1910.184 and the ASME B30.9, B30.10, and B30.26 standards. This guide explains both checks and gives you a free printable rigging & sling inspection sheet to download.

153+
Cities Served
50
States Covered
24–72h
Scheduling
100%
NCCCO Certified
✓ NCCCO Inspector Certified ✓ OSHA & ASME B30 Compliant ✓ Photo-Documented Reports ✓ Independent Third-Party ✓ EM 385-1-1 · USACE · NAVFAC

We are 3P Safety Inspections, a third-party crane inspection company working all 50 states. Our team carries NCCCO certification. We inspect to OSHA and the ASME B30 codes, and we do not sell or rent cranes — so our reports just give you the facts.

Independent Third-PartyWe do not sell or rent cranes. Our report has no sales angle — just the facts.
NCCCO-Certified InspectorsEvery inspection is signed by a credentialed, qualified-person inspector.
24-72 Hour SchedulingQuotes in about a business day.

We reach most sites in 24 to 72 hours.

Photo-Documented ReportsA clear PDF with each finding tied to a photo and the exact OSHA or ASME rule.
Inspecting cranes since 2005Independent — we do not sell or rent cranesNCCCO-certified inspectorsAll 50 states · 24–72 hr schedulingPhoto-documented reports

Each-Use Inspection

Before every lift, the rigger (a designated competent person) inspects each sling and fitting.

It is a hands-on look for the damage that retires rigging: broken wires or cuts, kinks and crushing, corrosion, heat or chemical damage, stretched or cracked links and hooks, and — the most common single reason gear is pulled — a missing or unreadable tag. No legible rated capacity, no lift.

Download our free rigging & sling inspection sheet to run the each-use check the same way every time, across wire-rope, chain, and synthetic slings.

Download our free rigging & sling inspection sheet

Rather have it inspected? Our NCCCO-certified inspectors perform rigging inspections in all 50 states. Request a quote and hear back in about a business day.

Periodic Documented Inspection

On top of the each-use check, OSHA and ASME B30.9 call for a documented periodic inspection — at least annually, and more often in hard or harsh service. A designated person records the condition of every sling and piece of below-the-hook hardware, tags out anything past its removal criteria, and keeps the record. The free sheet above doubles as that periodic record.

When Rigging Comes Out of Service

The removal criteria differ by sling type, and the table below summarizes them. In short: a wire-rope sling comes out at 10 randomly broken wires in one lay or 5 in one strand. A chain sling at cracks, stretch past 3%, or bent links. A synthetic sling at cuts, holes, crushing, or heat and chemical burns. And any sling with a missing or unreadable tag. Hooks (ASME B30.10) and shackles (B30.26) are measured for throat opening, twist, and wear.

Disclaimer. These checklists are free educational field aids, not professional or legal advice. They do not replace the documented inspection by a qualified person that OSHA and ASME require, and they do not cover every condition on every machine — always follow the manufacturer’s manual and the current OSHA and ASME standards. Use at your own risk; 3P Safety Inspections assumes no liability for their use. Any crane or lift with a safety defect should be taken out of service until a qualified person clears it to return.

When to Remove Rigging From Service (ASME B30.9)

Sling TypeRemove From Service When…
Wire-rope sling10 randomly broken wires in one lay, or 5 in one strand. Severe wear, kinking, birdcaging. Cracked or worn fittings
Chain slingCracks, nicks, gouges, stretch past 3% reach. Bent or twisted links. A missing or unreadable tag
Synthetic web slingCuts, holes, snags, crushed webbing. Heat, acid, or caustic burns. A missing or unreadable tag
Round (endless) slingCover cuts that expose the core yarn. Melting, charring, or chemical damage. A missing tag

The Standards Behind These Checks

Every report names the rule behind each find:

What You Get in Your Report

Here is what lands in your inbox:

Why Owners Pick 3P Safety Inspections

We answer to the standard, not a sales team. We show up when we say and write reports a foreman can read. You know the cost before we start.

Frequently Asked Questions

How often should slings be inspected?

Before each use by the rigger, under OSHA 1910.184(d), plus a documented periodic inspection at least annually — more often in heavy or severe service. Any sling that fails a criterion comes out of service at once.

When does a wire-rope sling come out of service?

When it shows 10 randomly broken wires in one rope lay or 5 in one strand, severe wear, kinking, crushing, birdcaging, corrosion, heat damage, cracked or worn fittings, or a missing, unreadable tag — per ASME B30.9.

When does a chain sling get removed?

For stretch or reach past 3%, cracks, nicks, gouges, arc burns, bent or twisted links, wear past the maker’s allowable, distorted master links or hooks, or a missing rated-capacity tag.

How do you inspect a synthetic web or round sling?

Run the full length by hand for cuts, holes, snags, crushed or abraded webbing, broken stitching, and heat or chemical burns. On round slings, any cover cut that exposes the core yarn means removal. A missing or unreadable tag is also cause to remove.

What are the hook and shackle removal criteria?

A hook is removed at a throat opening increased past 5%, twist past 10 degrees, wear past 10%, or a latch that will not close (ASME B30.10). Shackles and hardware come out for bending, stretch, wear past 10%, the wrong or unseated pin, cracks, or no legible rating (ASME B30.26).

Can a damaged sling be repaired?

No. Damaged slings are removed from service and destroyed, not repaired in the field. Some fittings can be replaced by the manufacturer, but a sling that hits a removal criterion comes out.

What standards cover rigging and sling inspection?

OSHA 1910.184 for slings, backed by ASME B30.9 (slings), B30.10 (hooks), and B30.26 (shackles, links, rings, and other rigging hardware).

Do you inspect rigging gear nationwide?

Yes. We inspect slings, hooks, shackles, and below-the-hook tools in all 50 states, with NCCCO-certified inspectors and 24-to-72-hour scheduling.

Authoritative References

OSHA 1926.1412 — Construction Crane InspectionThe official standard, straight from the source.Visit source about OSHA 1926.1412 — Construction Crane Inspection
OSHA 1910.179 — Overhead & Gantry CranesThe official standard, straight from the source.Visit source about OSHA 1910.179 — Overhead & Gantry Cranes
ASME B30 — Safety Standard for Cranes & RiggingThe official standard, straight from the source.Visit source about ASME B30 — Safety Standard for Cranes & Rigging
NCCCO — Crane Operator & Inspector CertificationThe official standard, straight from the source.Visit source about NCCCO — Crane Operator & Inspector Certification

Ready to Schedule Your Inspection?

Tell us your equipment types, locations, and inspection window. NCCCO-certified inspectors mobilize nationwide in 24 to 72 hours, and every engagement closes with a photo-documented, standards-cited report.

3P Safety: 5.0 on Google27 reviewsRead them on Google →
Follow 3P Safety: Facebook | Instagram | X | YouTube
Call (252) 229-5238Get a Quote