We reach most sites in 24 to 72 hours.
Hoist Inspection Services for Plants, Shops and Warehouses
Most facilities can tell you when their bridge cranes were last inspected.
Fewer can say the same about the chain hoist on the maintenance-bay jib, the air hoist on the paint line or the wire rope hoist riding a monorail into the shipping dock. Those units lift every day, often over people, and they wear the way a crane wears: load chain stretches, hooks open up, brakes lose their grip and limit switches stop limiting.
3P Safety Inspections is an independent, third-party inspection company. We inspect industrial hoists and the beams, bridges and tracks they hang from, then hand you a record of exactly what we found on each unit, tied to a photo and to the rule it falls under. We do not sell, rent or repair hoists, so nothing in the report is a sales line.
This page is about industrial hoists. Construction-site hoists are their own discipline with their own standards: for those, see material hoist inspection and personnel hoist inspection. If your hoist works inside a plant, a shop, a warehouse, a utility or a maintenance facility, you are in the right place.
The Hoists and Lifting Systems We Inspect
We inspect the hoist, what it hangs from and what it hangs over. A typical plant walk covers:
- Hand-chain hoists (manual chain hoists) on a hook or lug, or on plain and geared trolleys.
- Electric chain hoists on jibs, monorails and light bridges, with pendant or radio controls.
- Electric wire rope hoists on monorails and on single- and double-girder bridge cranes.
- Air-powered chain and wire rope hoists, along with the air supply lines, hoses and valves that feed them.
- Stationary hoists mounted to a base, a wall or a structure, which sit in the same ASME volume as overhead hoists.
- Monorail systems: the beam or track, hangers and supports, end stops, trolleys and carriers.
- Underhung bridge cranes and workstation cranes, including enclosed-track systems, with their runways and supports.
- Jib cranes that carry a hoist, inspected as one system with the jib crane inspection.
Top-running bridge and gantry cranes, and the hoist that rides their trolley, are covered on our overhead crane inspection page. Plants with both usually book them in the same visit, and our manufacturing plant crane inspections page shows how a whole-plant walk is organized.
Which Standards Govern a Hoist, and Where OSHA Draws the Line
ASME B30.16, Overhead Underhung and Stationary Hoists, is the consensus volume for the hoist itself. It covers construction, installation, operation, inspection, testing and maintenance of hand-chain, electric and air-powered chain and wire rope hoists that lift freely suspended, unguided loads. It carries separate inspection tables for hand-chain hoists and for electric- or air-powered hoists, plus its own section on personnel competence.
ASME B30.17, Cranes and Monorails (With Underhung Trolley or Bridge), covers what the hoist runs on: bridge cranes with an underhung trolley or bridge, jib and gantry cranes of that type, monorail systems with their trolleys and end trucks, and the track sections, runways and supports. B30.17 absorbed the former ASME B30.11, Monorails and Underhung Cranes, so a plant spec or an old report that still cites B30.11 now points to B30.17. Hooks fall under ASME B30.10 and wire rope under ASME B30.30.
OSHA 29 CFR 1910.179 applies to overhead and gantry cranes and others with the same fundamental characteristics, and its inspection paragraph covers the hoist on those cranes. Monorails and stand-alone overhead hoists are a different story. In a 1984 memorandum OSHA said monorails, monorail cranes and overhead hoists are not covered under 1910.179, and its 2017 enforcement memo says monorail hoists in general industry fall under the General Duty Clause, Section 5(a)(1), with industry standards such as ASME B30.17 as one way to show the equipment is used safely.
That is why our reports on monorail and stand-alone hoists say plainly which document each item comes from. We apply the 1910.179 frequent and periodic structure as recognized practice, alongside B30.16, B30.17 and the hoist manufacturer’s manual, which sets the specific limits for that model. On construction work the rules change again: OSHA’s construction rule for overhead hoists is 29 CFR 1926.554.
Federal facilities. On USACE work, EM 385-1-1 (2024) applies its load handling equipment chapter to equipment with a hoisting capacity over 2,000 lb, hoists included, and sends monorail track and underhung crane runways back to the manufacturer’s instructions and ASME B30.17 (para 16-8.bb(1)). Work to the edition your contract cites, and see our EM 385-1-1 compliance inspections for the federal paperwork.
California. California enforces its own crane rules under Title 8. A crane or derrick in lifting service rated over three tons needs its annual test and examination from a currently licensed certificating agency, which issues the certificate (Title 8 §5021). On those cranes our report is a Periodic inspection record, never a California certificate. See California crane inspections for how we work there.
Frequent and Periodic Hoist Inspection: What 1910.179 Lists
Paragraph (j) of 1910.179 splits inspections of cranes in regular service into two classes by interval: frequent inspections at daily to monthly intervals and periodic inspections at 1- to 12-month intervals, with the periodic interval depending on activity, severity of service and environment. New and altered cranes get an initial inspection before first use. The table shows what each class covers and the records the rule asks for.
| Inspection | Interval | What 1910.179 lists | Record it asks for |
|---|---|---|---|
| Frequent | Daily to monthly, by service | Operating mechanisms for maladjustment (daily), air or hydraulic lines, tanks and valves for leaks (daily), hooks for deformation or cracks, hoist chain and end connections for wear, twist, distorted links or stretch, mechanisms for excessive wear, and rope reeving against the manufacturer’s recommendations. [(j)(2)] | Hooks and hoist chain: a visual check daily, plus a monthly inspection with a certification record showing the date, the inspector’s signature and the hook or chain identifier. |
| Running rope | At least monthly | A thorough inspection of all ropes for reduced diameter, broken or worn outside wires, corroded or broken wires at end connections, damaged end connections, and kinking, crushing, cutting or unstranding. [(m)(1)] | A certification record with the date, the signature and the rope identifier, kept on file. |
| Periodic | 1 to 12 months, by activity, severity of service and environment | Everything in the frequent inspection, plus checks for deformed, cracked or corroded members, loose bolts or rivets, cracked or worn sheaves and drums, worn pins, bearings, shafts, gears and rollers, brake linings, pawls and ratchets, chain drive sprockets and chain stretch, and controller contactors, limit switches and pushbutton stations. [(j)(3)] | None set in (j)(3). Our photo-documented report is the record. |
| Idle or standby | Before return to service | Idle 1 to 6 months: the frequent inspection plus a rope inspection. Idle over 6 months: a complete inspection. Standby units: at least semi-annually. [(j)(4)] | A rope certification record for rope idle a month or more. [(m)(2)] |
Two related rules sit outside the inspection paragraph. At the start of each operator’s shift, the upper limit switch of each hoist is tried out under no load, with the block inched into the limit or run in at slow speed [(n)(4)(i)]. And any unsafe condition an inspection turns up is corrected before the equipment goes back to work [(l)(3)(i)].
1910.179 says what to inspect and how often. Apart from idle rope, which goes to an appointed person [(m)(2)], it does not name who does the inspecting, so ASME B30.16, the manufacturer’s manual and your own program fill that in. A workable split for most plants: trained operators and maintenance staff run the daily checks and the monthly records, and an independent inspector handles the periodic inspection and the documented report that goes with it.
What a Periodic Hoist Inspection Covers
We follow the load path from the support to the hook. Every observation ties back to the OSHA or ASME provision or the manufacturer’s limit that governs it.
Suspension, beam and trolley
Hook or lug suspension, trolley side plates, wheels and bumpers, the beam flange the wheels run on, end stops, hangers, clamps and bolted connections. On monorails and underhung cranes we check that the rated load is marked on the beam or bridge and not just on the hoist, because the beam and its supports carry their own rating, which can be lower than the hoist’s. EM 385-1-1 calls for the rated load to be plainly marked on each side of monorails and underhung cranes (para 16-8.bb(2)).
Hoist body, gearing and brakes
Housing, gearbox and seals for damage or leaks, the hoist motor and its connections, the holding brake, which should stop and hold a load without drift, and the mechanical load brake on hoists that have one. For hoists on cranes covered by 1910.179, each independent hoisting unit must have at least one self-setting holding brake [(f)(1)(i)].
Load chain and wire rope
Load chain is gauged for wear and stretch against the manufacturer’s limits and checked for twist, distorted links, gouges and a secure dead end and chain stop. Only the chain the manufacturer specifies for that hoist belongs in it. Wire rope is examined along its working length, at the drum, the rope guide and the end connections, for broken wires, corrosion, kinking, crushing and reduced diameter.
Hooks and latches
Throat opening is measured against a recorded benchmark, and the hook is checked for twist, wear and cracks and for a latch that closes. 1910.179 says a hook with cracks, more than 15 percent throat opening or more than 10 degrees of twist is discarded [(j)(2)(iii) and (l)(3)(iii)(a)]. ASME B30.10 sets the stricter current limit: a 5 percent throat increase, no more than 1/4 in., or any visible bend or twist. The report records the measurement against both.
Limits, controls and electrical
Upper and lower limit devices are tested with an empty hook at slow speed. We check pendant or radio controls and the emergency stop, control labels that can still be read, contactors and pushbutton stations, and the conductor bar or festoon that feeds the trolley. 1910.179 asks for pendant control stations to be kept clean with legible function labels [(l)(3)(iii)(d)].
Air hoists
The air supply line, hoses, couplings, valves and the air motor for leaks or damage, which is the daily item 1910.179 lists for air and hydraulic systems [(j)(2)(ii)], plus the same chain or rope, hook, brake and control checks as an electric hoist.
Markings and records
Rated load markings on the hoist, the load block and the beam or bridge, the manufacturer’s manual and your monthly records. Where a system rating can’t be confirmed from the documentation, we report it as a finding. Rating or re-rating equipment is the manufacturer’s or a qualified engineer’s call [(b)(3)], not an inspector’s.
Where the condition or the hoist’s history calls for it, the scope extends to load testing and nondestructive testing. Under 1910.179(k)(2), a rated load test is no more than 125 percent of the rated load unless the manufacturer recommends otherwise. Our guide to hoist brake testing explains how a brake is verified under load.
Hoist Fleet Programs for Plants
Hoists multiply quietly. A plant that put one hoist on a jib years ago may now have one at every workstation, plus spares in the crib. A fleet program keeps every unit on the schedule:
- A unit register. Every hoist gets an ID, yours or ours, tied to its location, type, rated load, serial number and service, so each inspection starts from the last one.
- Intervals set by service. A hoist cycling on a production line and a spare used twice a year don’t share a calendar. We recommend periodic intervals within the 1910.179 range by activity, severity of service and environment, and flag units idle long enough to need an inspection before use.
- One mobilization per site. Units are grouped by area and scheduled around production, shutdowns and maintenance windows.
- A report per unit and a fleet summary. Each hoist gets its own photo-documented report, and the fleet summary lists every unit’s disposition and open items in one table. An editable summary spreadsheet is available for CMMS import.
- Noted items carried forward. Conditions we’re watching are re-checked at the next visit instead of being forgotten.
- Multi-site agreements. Multi-site and multi-state programs run under a master service agreement with one point of contact.
Crane and Hoist Inspection on the Same Visit
If your hoists share a floor with bridge cranes, you don’t need two vendors or two trips. Send one equipment list, and we inspect the cranes and the hoists in one mobilization, with a report per unit and one fleet summary.
How Findings Are Recorded
Every hoist gets a checklist with three columns: SAT (inspected, satisfactory), NOTED (recorded for follow-up and carried to the findings table, not a failure) and N/A (not applicable or not inspected, with the reason stated). Every NOTED item becomes a numbered finding with a photo, the OSHA, ASME or manufacturer reference it falls under, and a recommended action rated by urgency, from remove from service and repair before use down to recommended repair, monitor and minor.
The deliverable is an inspection report, not a certificate. It records the condition we found on the date we inspected, with each unit identified by its serial number or your ID. Reports go out within 24 to 72 hours for most engagements.
Your in-house checks use simpler marks: S, U or N/A on the frequent inspection log below. U means the item is unsatisfactory, and the hoist stays out of use until it’s corrected.
Free Download: Hoist Frequent Inspection Log (PDF)
Our one-page Hoist Frequent Inspection Log (PDF) covers one hoist for one month: seven daily checks marked S, U or N/A, a monthly record with the date, signature and hook, chain or rope identifier that 1910.179 asks for, and a box for problems found and how they were fixed. It is free to print and copy. For the walk-around before each shift, pair it with our chain hoist inspection checklist.
Nationwide Coverage, Fast Turnaround and Who Does the Work
3P Safety Inspections works in all 50 states from five offices: headquarters in Goldsboro, North Carolina, plus Raleigh, Virginia Beach, Tampa and Colorado Springs. Send a hoist list with types, rated loads and locations, and an itemized quote comes back within a business day. We reach most sites within 24 to 72 hours of quote acceptance.
The work is led by an NCCCO-certified crane inspector (MCI · TCI), founder Patrick Salazar, who has been in the field since 2005. Every engagement is quoted per scope: the number and type of hoists, how they’re grouped on site, and any load testing or NDT you need.
Tell us what you have. Request a hoist inspection quote or call (252) 274-0583, and we’ll scope the visit around your production schedule.
Frequently Asked Questions
Does OSHA 1910.179 apply to monorail and stand-alone hoists?
1910.179 covers overhead and gantry cranes, including the hoist on their trolley. In a 1984 memorandum OSHA said monorails, monorail cranes and overhead hoists are not covered under 1910.179, and its 2017 enforcement memo says monorail hoists in general industry fall under the General Duty Clause, Section 5(a)(1), with industry standards such as ASME B30.17 as one way to show safe use. We apply the 1910.179 frequent and periodic structure as recognized practice alongside B30.16, B30.17 and the manufacturer’s manual.
How often do hoists need to be inspected?
Under 1910.179, frequent inspections run at daily to monthly intervals and periodic inspections at 1- to 12-month intervals, depending on activity, severity of service and environment. Hooks and hoist chain get a visual check daily and a monthly inspection with a written record, running rope gets a thorough inspection at least monthly, and a unit idle for a month or more is inspected before it goes back into service. The manufacturer’s manual may set shorter intervals for a given model.
Which ASME standard covers monorails and workstation cranes?
ASME B30.17, Cranes and Monorails (With Underhung Trolley or Bridge). It absorbed the former B30.11, Monorails and Underhung Cranes, and covers monorail systems with their trolleys and end trucks, underhung bridge cranes, and the track, runways and supports they hang from. Workstation cranes are underhung bridge cranes or monorails, so they fall in that scope. The hoist itself falls under ASME B30.16.
Who should do the daily and monthly hoist checks?
1910.179 lists what to inspect and how often but does not name a credential for the inspector, so ASME B30.16, the manufacturer’s manual and your own program fill that in. A practical split: trained operators and maintenance staff run the daily checks and the monthly records on a log like ours, and an independent inspector performs the periodic inspection and writes the documented report.
Do you load test hoists?
Yes, where a test is called for, such as a new or altered installation, a repair the manufacturer says needs one, or a program or contract requirement. Under 1910.179(k)(2), a rated load test is no more than 125 percent of the rated load unless the manufacturer recommends otherwise. Load testing and NDT are quoted as part of the scope.
What do we get after the hoist inspection?
A photo-documented report for each hoist with the unit ID, serial number and rated load, a SAT, NOTED or N/A mark on every checklist item, and a numbered finding with a photo, the governing reference and a recommended action for each NOTED item. Fleets also get a summary table. It is an inspection report, not a certificate, and reports go out within 24 to 72 hours for most engagements.
How do I find crane and hoist inspection services near me?
You don’t need a local shop. We work in all 50 states from offices in Goldsboro, Raleigh, Virginia Beach, Tampa and Colorado Springs, and we reach most sites within 24 to 72 hours of quote acceptance. Our service areas page lists the states and cities we cover, or send your hoist list and site address for a quote within a business day.
Do you inspect hoists and cranes in California?
Yes, with California’s limit in mind. A crane or derrick in lifting service rated over three tons needs its annual test and examination from a Cal/OSHA-licensed certificating agency, which issues the certificate (Title 8 §5021). On those cranes our report is a Periodic inspection record, never a California certificate.
Related: overhead crane inspection, gantry crane inspection, rigging inspection, third-party crane inspection, service areas, about 3P Safety Inspections.